File #: WC 2022-080    Version: 1 Name:
Type: CR Water Topic Status: Motion Approved
File created: 9/14/2022 In control: Castle Rock Water Commission
On agenda: 9/28/2022 Final action: 9/28/2022
Title: Authorization for Resolution Approving a Construction Contract with Hydro Resources - Rocky Mountain, Inc. for the Drilling of the East Plum Creek Open Space (EPC OS) Wells located north of Plum Creek Water Purification Facility [Open space north of Plum Creek Water Purification Facility] Town Council Agenda Date: October 18, 2022
Attachments: 1. Attachment B: Location Map, 2. Attachment C: Sole Source Justification Form (Fillable)_Hydro TESC and pad
Related files: RES 2022-115

To:                     Members of the Castle Rock Water Commission

 

From:                     Mark Marlowe, P.E., Director of Castle Rock Water

                     Matt Benak, P.E., Water Resources Manager

                     Heather Justus, P.G. Water Resources Project Manager

                     

Title

Authorization for Resolution Approving a Construction Contract with Hydro Resources - Rocky Mountain, Inc. for the Drilling of the East Plum Creek Open Space (EPC OS) Wells located north of Plum Creek Water Purification Facility [Open space north of Plum Creek Water Purification Facility]

Town Council Agenda Date: October 18, 2022

Body

________________________________________________________________________________

 

Executive Summary

 

The purpose of this memorandum is to request Town Council’s approval of a Resolution (Attachment A) approving a construction agreement with Hydro Resources - Rocky Mountain, Inc. (Hydro) for the construction, including drilling, completion, and testing for Wells CR-234, CR-235, and CR-236 located in the East Plum Creek Open Space (EPC OS) north of the Plum Creek Water Purification Facility (PCWPF).  The future location of the EPC OS Well Facility is shown in Attachment B.  The drives and pumping equipment installation will be under a separate contract as staff needs to have the aquifer testing information to properly size the equipment that will be the most efficient at this well facility.  The contract is for the construction of three new wells, one Arapahoe Aquifer well, one Denver Aquifer well and one Dawson Aquifer well that will supply raw water to either PCWPF or Meadows Water Treatment Plant (Meadows) and have the capability for aquifer storage and recovery (ASR).  The wells will add new capacity from the existing Denver Basin Aquifers and have the ability to store excess supplies (when available). 

 

Since there are limited well drilling services available currently in the area and a large amount of demand for their services, Castle Rock Water (CRW) staff met with Hydro, who has been working for the Town on other projects, to determine if their schedule could accommodate the drilling of the EPC OS wells starting Fall of 2022.  Project commencement in Fall 2022 is critical to completing the wells in a timely manner so that they are available by Spring 2024.  Many of the electrical items have long lead times.  For example, the drives currently have a 52-week lead time.  Through the bidding of previous drilling and rehabilitation projects, staff has determined that Hydro’s prices are competitive.  Hydro has completed recent projects on budget and on schedule.  Staff recommends approving a construction contract agreement based on the qualified proposal from Hydro Resources - Rocky Mountain, Inc. in the amount of $4,483,540.00.  In addition, CRW staff request a 10% Town-managed contingency in the amount of $448,354.00 for a total authorization of $4,931,894.00.  The Construction Agreement is included as Exhibit 1 to the Resolution.  The pumping and ASR equipment packages will be under a separate contract with Hydro.  The facility and infrastructure construction packages will be sent out to bid in the late Fall of 2022. 

 

Discussion

 

Based on the Water Resources Supply and Demand Model, high population growth trends, aging infrastructure, and the need for ASR near PCWPF, it is necessary to keep pace with meeting our customers’ water demands.  With the variability of WISE deliveries, renewable water variability, and lower demands in the winter months, a storage option is needed when these supplies exceed demand.  One of the solutions is ASR, which is the ability to store water in the aquifer and recover the water through pumping when needed.  The design of an ASR well is slightly modified to take into consideration the water that will be delivered into the aquifer through the well which will cause the water level in the well to increase.  The project will include the drilling, completion, and pump testing of one Arapahoe Aquifer well, one Denver Aquifer well and one Dawson Aquifer well.  Staff anticipates that the Arapahoe Aquifer well will produce 250 to 300 gallons per minute (gpm), the Denver Aquifer well will produce 200 to 250 gpm, and the Dawson Aquifer well will produce 50 to 80 gpm or approximately a total of 0.72 to 0.90 million gallons per day (mgd). 

 

Upon direction from Castle Rock Water leadership that we need to continue to move forward on this project, staff met with Hydro to determine schedule availability and timing.  Based upon this meeting, previous bidding information, and the desire to drill the wells during the fall/winter months, staff determined that sole sourcing (see Attachment C) the drilling construction contract would be in the Town’s best interest.  Hydro has the availability to begin construction as early as the end of October 2022.  Staff worked with Leonard Rice Engineers, Inc. to prepare site-specific well designs based on the locations in the aquifers for each well and for ASR.  In addition, the well specifications were updated and refined to reflect changes in designs and lessons learned from previous projects.      

 

The new well design includes using stainless steel casing, maximizing the screen intervals below the static water table and using stainless steel drop pipe in the pumping equipment.  For ASR, additional stainless steel casing needs to be added to the casing string to take into account the recharging of water into the well and raising the water level.  Using stainless steel increases, the longevity and efficiency of the wells.  Over the last few well rehabilitation projects, through the pre-cleaning videos and the condition of the drop pipe, staff has noted increased corrosion on the casing and the drop pipes due to the introduction of oxygen into the wells.  In addition to reducing corrosion, the growth of iron bacteria will slow down with the reduction of an iron source, which could potentially reduce the overall costs of future rehabilitation of the wells and will increase the life of the wells.

 

Hydro’s proposal addressed the full scope of work and alternative scope items, and staff believes the proposal amount to be of good value to the Town based on previous similar scopes of work.  In addition, staff completed a detailed line item comparison of the items included in this scope of work and the actual costs for Wells CR-232 and CR-233.  Staff expected an overall increase of 40% due to increases in construction and materials, the actual increase averaged closer to 30%.  The CR-232 and CR-233 drilling contract with Hydro was executed in 2019, when comparing the Denver construction and material indexes between September 2019 and September 2022 the increases are 16% and 29%, respectively.

 

The well construction, which includes the drilling, completion, and testing for the wells is planned to start in the Fall of 2022 and is expected to continue through the end of February 2023.  The drilling, completion, and development activities for the three wells will occur back to back with CR-234 drilling starting first.  Once CR-234 is completed, then Hydro will mobilize to CR-235 and upon completion they will then mobilize to CR-236.  Once drilling and construction of the wells is complete, the drilling rig will mobilize off-site and the pump rig will mobilize on-site to complete the pumping tests of the three wells.  Pump testing for the wells will start in February with the installation of the new pumping equipment and controls to follow in a separate contract that is anticipated for Spring 2023. CRW staff is currently in the process of designing the facility.  We anticipate awarding the construction contract in the timeframe between March 2023 and April 2023.  Staff anticipates overall completion of the project in April of 2024. 

 

Additional background on the total estimated cost of the project is provided in the table below.

 

Consultant/ Contractor

Duties

Proposed Budget^ or Staff Estimated Budget*

Leonard Rice Engineers, Inc.

design of wells and oversight of drilling

$84,436.00^

Hydro Resources, Rocky Mountain Inc.

drilling, completion and testing of wells

$4,931,894.00^

Hydro Resources, Rocky Mountain Inc.

Pumping equipment installation

$2,500,000*

Facility Design Consultant

Design well facility

$172,000*

Facility Contractor

Construction of the facility and yard piping

$3,000,000*

Estimated Total Cost

 

$10,688,330.00*

^ = Proposed Budget

* = Staff Estimated Budget

 

Public Outreach  

 

Notification letters will be sent to the residents and businesses near the well facility site prior to commencing drilling activities.  In addition, the project information will be posted on the Town’s Development Activity map as one of the Water Projects. 

 

Budget Impact

 

The funding for the construction contract will come from CIP Account 210-4275-442.75-39 (New Wells), which has a balance of $0.  Staff had decided not to carry forward 2021 funds as an estimate, opting to budget when actual project costs were established.  Therefore, a budget amendment will need to be completed for this project.  The Town will use these capital funds in reserve for the construction, which includes drilling, completion, and testing of this project.  The Hydro proposal fee is $4,483,540.00.  Staff requests a Town-managed contingency in the amount of $448,354.00 for a total authorization of $4,931,894.00.

 

Project                                    Amount                  Contingency               Total Amount

210-4275-442.75-39           $4,483,540.00              $448,354.00                $4,931,894.00

New Wells

 

Proposed Motion

 

“I move to recommend to Town Council approval of the Resolution as presented

 