Castle Rock Banner
File #: ID 2020-033    Version: 1 Name:
Type: Update/Presentation Item Status: Filed
File created: 3/9/2020 In control: Town Council
On agenda: 3/17/2020 Final action: 3/17/2020
Title: Development Services Project Updates

To:                     Honorable Mayor and Members of Town Council

 

From:                     Bill Detweiler, Director of Development Service

 

Title

Development Services Project Updates

Body

________________________________________________________________________________

 

The high growth nature of Castle Rock results in numerous and diverse questions from individuals seeking information about existing conditions and future plans. All community development activity information is located on the Town website under the Development Activity link and In Your Backyard interactive map.

 

Development activity remains consistent with past years given recent news about stock market activity, trade, and construction material costs and availability. Permit activity remains high and homebuilders and commercial builders remain active.

 

1.                     Quasi-Judicial Applications Requiring Public Hearings:

 

Olinger Andrews Caldwell Gibson Chapel Renovation 407 Jerry St.

 

 

 

Olinger Andrews Caldwell Gibson Chapel submitted a Site Development Plan application for a new chapel located at 407 Jerry Street. The proposal involves demolishing the existing building and constructing a new chapel. Town Council approved the demolition last fall. The project requires approval from the Design Review Board and is located in Mayor Pro Tem Bower’s District.

 

North Basin Village at Terrain Phase 1

 

 

Stratus Development submitted a Site Development Plan for approximately 96 homes in the Terrain North Basin Area along Castle Oaks Drive. The project requires two more neighborhood meetings prior to scheduling public hearings with the Planning Commission and Town Council. The proposal is located within Councilmember Townsend’s District.

 

2.                     General Inquiries in the Town or within the County:

None.

 

3.                     Pre-Application Meeting Requests:

 

Daycare Expansion 2893 Deerfoot Way

 

 

Ms. Amy’s Tot Academy is proposing an expansion from the existing small in-home day care to a large day care. The daycare is currently in a residential home located at 2893 Deerfoot Way in the Meadows community. If the project moves forward it will require public hearings with the Planning Commission and Town Council for a Use by Special Review. The proposal is located in Councilmember Bracken’s District.

 

Flight Banking ATM (located in the Walmart parking Lot)

 

 

Flite Banking Centers is proposing a single lane drive-up ATM on the west end of the Walmart parking lot. The facility will remove eight existing parking spaces. The proposal is located in Councilmember Townsend’s District.

 

Lanterns Planned Development Amendment

 

 

 

Lanterns development is proposing a gas station and convenience store at the southwest corner of Crystal Valley Parkway and Plum Creek Boulevard. This parcel is zoned for commercial, non-residential uses, but gas station is not included in the use list so a PD amendment is needed, which requires public hearings with the Planning Commission and Town Council. The proposal is located in Councilmember Teal’s District. 

 

4.                     Development Activity:

 

Site Development Activity/Commercial

 

                     Promenade:

o                     Whole Foods, interior finish, located southeast of Promenade Parkway and Castle Rock Parkway, proposed opening is Thursday April 2, 2020.

o                     Buffalo Wild Wings, site plan review, located on southwest corner of Factory Shops Boulevard and New Memphis Court.

o                     La Loma Restaurant, site and building construction, located southwest of Promenade Parkway and Castle Rock Parkway, proposed opening in late summer / fall 2020.

o                     Panda Express, site and building construction, located west of Sam’s Club on the east corner of Promenade Parkway and Factory Shops Blvd. intersection.

o                     Retail building, site and building construction, located west of Sam’s Club on the east corner of Promenade Parkway and Factory Shops Blvd. intersection.

o                     Sleep Number, site plan review for a 4,000 sq. ft. building located on east side of Promenade Parkway, just south of Verizon building.

o                     Shake Shack, site plan review for restaurant located on east side of Promenade Parkway, just south of Verizon building.

 

                     Meadows:

o                     Town Center:

§                     Two 10,000 sq. ft. retail/restaurant buildings, site plan review, located at the west corner of Meadows Parkway and Meadows Boulevard.

§                     Mixed-use, a 17,000 sq. ft. building and site construction located on Ambrosia Street.

§                     Mixed-use, building and site construction for a restaurant and 111 multi-family residential units in a four-story building located at the northeast corner of Bilberry Street and Mercantile Street.

§                     Park area site plan, located between Viridian and Saffron Streets.

§                     Ubergrippen, site and construction plans for 18,000 sq. ft. indoor climbing wall facility, located on Bilberry Street south of Mercantile Street including a trail connection to the tunnel under Meadows Boulevard.

o                     Bridge and access road, construction documents, connection of the roundabout on North Meadows parkway south and then east crossing Plum Creek.

o                     Castle View High School addition, site plan review, located at North Meadows Drive and Butterfield Crossing Drive.

o                     IREA Substation, site construction, located east of Castle View High School and ACC Collaboration Campus.

o                     Lot grading, retaining wall and waterline construction plan review, located on vacant commercial lot northerly of the AMC theatre.

o                     Meadows Family Eye Care office building, site and building construction, located at Prairie Hawk and Dacoro Lane.

o                     Tommy Carwash, site and building construction, located north of Meadows Parkway and Lombard Street intersection.

o                     Water line, construction adjacent to North Meadows Parkway, between State Highway 85 and East Plum Creek.

 

                     Downtown:

o                     Encore, building permits were issued as work continues on the site grading and foundation construction, northeast corner of Wilcox and South Streets.

o                     Great Divide, building permit issued for tenant improvement in Riverwalk North.

 

                     Other Commercial Projects throughout Town:

o                     Acme Brick, rezoning request under review for Interchange Overlay, located at 401 and 661 Prairie Hawk Drive.

o                     Brookside Skilled Nursing/Castle Rock Health Campus, site and building construction, new 32-bed skilled nursing facility located on South Perry Street.

o                     Castle Rock Automotive, site construction, automotive service building and flex building on the northeast corner of South Perry Street and I-25 frontage road.

o                     Castle Rock Industrial Park, site and building construction, office, warehouse, and flex space located at the northwest intersection of State Highway 85 and Liggett Road.

o                     Convenience Store and retail space, site plan review, 7,200 sq. ft. building and Fuel Island located at the southeast corner of Plum Creek Parkway and Lake Gulch Road, adjacent to the planned Town roundabout.

o                     Dutch Brothers Coffee, site plan approved for building changes, located in previous Good Times building at 248 Metzler Drive.

o                     Heckendorf Ranch Retail, site and building construction, located southwest intersection of Crystal Valley Ranch and Plum Creek Boulevard.

o                     Crystal Valley Ranch, revisions to landscaping plans, located west of West Loop Road and River Oaks Street.

o                     Founders Marketplace, Canvas Credit Union, and Liberty Express Carwash, site construction located northeast of Fifth Street and Founders Parkway.

o                     Founders Marketplace, site plan approved mixed-use retail building located on Ridge Road between King Soopers Fueling Station and IREA substation.

o                     Garage Condos, site and building construction, located on Liggett Road.

o                     Heckendorf Ranch, site plan review, 10,000 sq. ft. retail building located south of Fire Station 152 on Crystal Valley Parkway.

o                     Miller’s Landing, site construction plan review, phase one future commercial development site, roadway work, and channel improvement located on Plum Creek Parkway east of P.S. Miller Park.

o                     Montana Vista, site plan approved and construction plan review, 18,000 sq. ft. building located at Alexander Place and Brewer Court.

o                     Outlets at Castle Rock, site plan and construction document review for a Columbia store addition.

o                     Outlets at Castle Rock, site plan, new pad site on northwest side of mall on Factory Shops Boulevard.

o                     Outlets at Castle Rock, site plan, two new pad site on west side of mall on Factory Shops Boulevard.

o                     Outlets at Castle Rock, site plan, five small cell facilities on several buildings.

o                     Plum Creek Community Church, building addition and parking lot expansion located on the I-25 East Frontage Road south of Medved.

o                     T-Mobile small cell sites, construction documents for 4 locations in the public right-of-way: 1) Park Street and 8th Street, 2) Factory Shops Blvd & New Memphis, 3) Factory Shops and Outlet Entrance, 4) Limelight near Hospital ER Entrance.

o                     Target, site plan approved, exterior signage and lighting changes.

o                     The Famous Steak House, site development plan and interior building renovation, located in former Jarre Creek Brewery building south of Chili’s.

o                     Town of Castle Rock Public Safety Training Facility, site and building construction, located at 301 Malibu Street.

o                     Town of Castle Rock Water, construction plans, water plant expansion located southwest of Liggett Road and I-25.

o                     U-Haul self-storage, site construction, located on I-25 East Frontage Road north of South Perry Street and Manatt Court.

o                     Verizon small cell sites, construction documents for multiple locations in public right-of-way:  1) Factory Shops Boulevard and New Beale Street, 2)Promenade Parkway and Castle Rock Parkway, 3) Promenade Parkway, 4) Castlegate Drive West, 5) Castlegate Drive West and Castle Rock Parkway, 6) Factory Shops Boulevard and Meadows Boulevard, and 7) Mitchell Street near Mesa Middle School.

o                     Your Storage Center, site plan for 23,800 sq. ft. indoor car storage building, located on the east I-25 frontage road north of Perry Street.

 

                     Site Development Activity/Residential:

o                     Caliber at Terrain, site plan review for a 226 unit multifamily development, located in the northeast quadrant of Founders Parkway and State Highway 86.

o                     Canyons South (Douglas County project), water system construction for 278 single-family lots. (Town will own and maintain the project’s water system per previous agreements.)

o                     Crystal Valley Ranch, site construction, single-family subdivisions located in southern interior portion of Loop Road, south of Loop Road, and between West Loop Road and the Lanterns property.

o                     Crystal Valley Ranch, construction plan review for a recreation facility that will serve the new single-family home project located at the southeast corner of West Loop Road and Crystal Valley Parkway.

o                     Founders Village, construction plan review, detached single-family home neighborhood located northeast of Mikelson Blvd. and Mitchell Street.

o                     Founders Village, site plan review, paired single-family home neighborhood, located north of Mikelson Blvd and west of Mitchell Street.

o                     Founders Village the Enclave, site construction, 88 additional townhomes to complete the existing development located at Enderud and Wagonwheel.

o                     Hillside, construction document approved, single family attached and detached age 55 and older at the northeast corner of Coachline Road and Wolfensberger.

o                     Lanterns/Montaine, site construction, main collector loop roadway Montaine Boulevard and construction documents for Amenity Center and two neighborhoods located south of Montaine Boulevard.

o                     Liberty Village, construction documents, single-family lots located on the north side of Castle Oaks Drive.

o                     Meadows, site construction, 209 single-family lot subdivision located north of Red Hawk subdivision and west of Prairie Hawk Drive.

o                     Meadows, Town Stormwater Project, construction of underdrains adjacent to Starry Night Loop and Hourglass Ave.

o                     Meadows, site plan and construction documents for 57 single-family detached homes on the east and west sides of Coachline Road north of Wolfensberger.

o                     Meadows South, site construction for 116 single family attached homes on the south side of Wolfensberger Road and adjacent to PS Miller Regional Park.

o                     Meadows Town Center, construction documents, single-family subdivision located north of Meadows Blvd. between Low Meadow and Trail Blazer.

o                     Meadows Town Center, construction, The Springs multi-family apartment complex located at the corner of Bilberry and Viridian.

o                     Memmen Young Infill, rezoning under review for 377 single-family units and 260 duplex units, located west of Ridge Road and north of Plum Creek Parkway.

o                     Plum Creek Ridge Townhomes, under construction, located at Plum Creek Parkway and Emerald.

o                     Red Hawk, construction document review, single-family subdivision located south of Melting Snow Way and east of Bent Wedge Point.

o                     Terrain Sunstone Village, construction, single-family home development located south of intersection of State Highway 86 and Autumn Sage.

o                     Terrain Upper Sunstone, construction documents, single-family home development south of State Highway 86 and east of King Soopers/Ridge Road.

o                     The Oaks Filing 3, site construction, 117 single-family lots located on South Ridge Road west of Appleton Way.