Castle Rock Banner
File #: ID 2019-129    Version: 1 Name:
Type: Update/Presentation Item Status: Filed
File created: 12/5/2019 In control: Town Council
On agenda: 12/17/2019 Final action: 12/17/2019
Title: Development Services Project Updates

To:                     Honorable Mayor and Members of Town Council

 

From:                     Bill Detweiler, Director of Development Service

 

Title

Development Services Project Updates

Body

________________________________________________________________________________

 

The high growth nature of Castle Rock results in numerous and diverse questions from individuals seeking information about existing conditions and future plans. All community development activity information is located on the Town website under the Development Activity link and In Your Backyard interactive map.

 

1.                     Quasi-Judicial Applications Requiring Public Hearings:

None

 

2.                     General Inquiries in the Town or within the County:

Douglas County School District Drainage Issue

 

 

Stormwater ponding at the entrance to the office spaces at the West Support Facility caused damage to the surrounding plaza areas and walks. The brick veneer at the base of canopy roof columns was also damaged by the excess water and constant use of salt to mitigate ice at the entry. Staff will provide representatives from the School District with critical comments. The proposal is located in Councilmember Bower’s District.

 

 

3.                     Pre-Application Meeting Requests:

 

Shake Shack Promenade

 

 

The restaurant proposal includes a 3,721 sq. ft. building with an 830 sq. ft. exterior patio. The project is located south of the existing Verizon Building. Timing of the project is unknown. The proposal is located in Councilmember Townsend’s district.

 

Terrain Ravenwood Replat

 

 

The Terrain Ravenwood Park and the Terrain Ravenwood Pool have separate ownerships and the request is to divide one lot into two lots to separate the two facilities. Timing of the project is unknown. The proposal is located in Councilmember Townsend’s District.

 

4.                     Development Activity:

 

Site Development Activity/Commercial

 

                     Promenade:

o                     Whole Foods, site and building construction, located southeast of Promenade Parkway and Castle Rock Parkway.

o                     La Loma Restaurant, site and building construction, located southwest of Promenade Parkway and Castle Rock Parkway.

o                     Panda Express, site plan, construction documents, and building plan review, located west of Sam’s Club on the east corner of Promenade Parkway and Factory Shops Blvd. intersection.

o                     Retail building, site construction, located west of Sam’s Club on the east corner of Promenade Parkway and Factory Shops Blvd. intersection.

                     Meadows:

o                     Town Center:

§                     Mixed-use 17,000 sq. ft., building and site construction, located on Ambrosia St.

§                     Mixed-use, building and site construction plan review, restaurant and 111 multi-family residential units in a four story building located at the northeast corner of Bilberry Street and Mercantile Street.

§                     Park area site plan, located between Viridian and Saffron Streets.

§                     Ubergrippen, site plan for 18,000 sq. ft. indoor climbing wall facility, located on Bilberry Street south of Mercantile Street.

o                     Bridge and access road, construction documents, connection of the roundabout on North Meadows parkway south and then east crossing Plum Creek.

o                     Castle View High School addition, site plan review, located at North Meadows Drive and Butterfield Crossing Drive.

o                     IREA Substation, construction documents, located east of Castle View High School and ACC Collaboration Campus.

o                     Jiffy Lube, site and building construction, located north of Meadows Parkway and Lombard Street intersection.

o                     North Meadows Parkway, roundabout construction for future intersection located north of Castle View High School between the two bridges, providing access to the future commercial-office-industrial parcels on each side of North Meadows Pkwy.

o                     Medical office building, site development plan, located at Prairie Hawk and Dacoro Lane.

o                     Tommy Carwash, site and building construction, located north of Meadows Parkway and Lombard Street intersection.

o                     Water line, construction adjacent to North Meadows Parkway between State Highway 85 and East Plum Creek.

                     Downtown:

o                     Encore, site grading and construction plan review northeast corner of Wilcox and South Streets.

o                     Great Divide, building permit for tenant improvement under review located in Riverwalk North.

                     Other Commercial Projects throughout Town:

o                     Acme Brick, rezoning request under review for Interchange Overlay, located at 401 and 661 Prairie Hawk Drive.

o                     Brookside Skilled Nursing/Castle Rock Health Campus, site and building construction, new 32-bed skilled nursing facility located on S. Perry Street.

o                     Calvary Chapel, construction and soil erosion control documents for approximately 23,000 sq. ft. church building, located at Fifth Street and Woodlands Boulevard.

o                     Castle Rock Automotive, site construction, automotive service building and flex use building on the northeast corner of South Perry Street and I-25 frontage road.

o                     Castle Rock Industrial Park, site and building construction, office, warehouse, and flex space located at the northwest intersection of State Highway 85 and Liggett Road.

o                     Convenience Store and retail space, site plan review, 7,200 sq. ft. building and Fuel Island located at southeast corner of Plum Creek Parkway and Lake Gulch Road.

o                     Crystal Valley Ranch, revisions to landscaping plans, located west of West Loop Road and River Oaks Street.

o                     Founders Marketplace, Canvas Credit Union, and Liberty Express Carwash, site construction located northeast of Fifth Street and Founders Parkway.

o                     Founders Marketplace, site plan review, mixed-use retail building of 6,975 sq. ft. located on Ridge Road between King Soopers Fueling Station and IREA substation.

o                     Garage Condos, site construction, located on Liggett Road.

o                     Heckendorf Ranch, site plan review, 10,000 sq. ft. retail building located southwest of Crystal Valley Parkway and Plum Creek Boulevard and south of Fire Station No. 152.

o                     Miller’s Landing, site construction plan review, phase one future commercial development site, roadway work, and channel improvement located on Plum Creek Parkway east of P.S. Miller Park.

o                     Montana Vista, site plan review, 18,000 sq. ft. building located at Alexander Place and Brewer Court.

o                     Outlets at Castle Rock, site plan and construction document review, Columbia store 1,993 sq. ft. addition located at southwest end of Outlet Mall.

o                     Outlets at Castle Rock, site plan, new pad site on northwest side of mall on Factory Shops Boulevard.

o                     Plum Creek Community Church, building and site plan, building addition and parking lot expansion located on the I-25 East Frontage Road south of Medved.

o                     Target, site plan review, exterior signage and lighting changes located at 5010 Founders Parkway.

o                     The Famous Steak House, site development plan and interior building renovation, located in former Jarre Creek Brewery building south of Chili’s.

o                     Town of Castle Rock Public Safety Training Facility, site and building construction, located at 301 Malibu Street.

o                     Town of Castle Rock Public Works Service Center expansion, site construction located at 4175 S. Castleton Court.

o                     Town of Castle Rock Water, construction plans, water plant expansion located southwest of Liggett Road and I-25.

o                     U-Haul self-storage, site construction, located on I-25 East Frontage Road north of South Perry Street and Manatt Court.

 

                     Site Development Activity/Residential:

o                     Caliber at Terrain, site plan review for a 226 unit multifamily development, located in the northeast quadrant of Founders Parkway and State Highway 86.

o                     Crystal Valley Ranch, site construction, single-family subdivisions located in southern interior portion of Loop Road, south of Loop Road, and between West Loop Road and the Lanterns property.

o                     Founders Village, construction plan review, attached single-family home neighborhood site grading underway located northeast of Mikelson Blvd. and Mitchell Street, southeasterly of Mesa Middle School.

o                     Founders Village the Enclave, site construction, 88 additional townhomes to complete the existing development located at Enderud and Wagonwheel.

o                     Hillside, construction document review, single family attached and detached age 55 and older residential community located at the northeast corner of Coachline Road and Wolfensberger.

o                     Lanterns/Montaine, site construction, main collector loop roadway Montaine Boulevard and construction documents for Amenity Center and two neighborhoods located south of Montaine Boulevard (south of King’s Ridge subdivision).

o                     Liberty Village, construction documents, single-family lots located on the north side of Castle Oaks Drive.

o                     Liberty Village, bridge crossing, Castle Oaks Drive and McMurdo Gulch channel improvements.

o                     Meadows, site construction, 209 single-family lot subdivision located just north of Red Hawk subdivision, west of Prairie Hawk Drive. 

o                     Meadows, Town Stormwater Project, construction of underdrains adjacent to Starry Night Loop and Hourglass Ave.

o                     Meadows, site plan and construction documents for 57 single family detached neighborhood located on east and west sides of Coachline Road north of intersection with Wolfensberger Road, adjacent to Ridgeline Open Space.

o                     Meadows South, site plan and construction documents for 116 single family attached neighborhood located on south side of Wolfensberger Road, adjacent to PS Miller Regional Park.

o                     Meadows Town Center, construction documents, single-family subdivision located north of Meadows Blvd. between Low Meadow and Trail Blazer.

o                     Meadows Town Center, construction, Springs multi-family apartment complex located at corner of Bilberry and Viridian.

o                     Memmen Young Infill, rezoning under review for 377 single family units and 260 duplex units, located west of Ridge Road, south of Fifth Street, and north of Plum Creek Parkway.

o                     Plum Creek Ridge Townhomes, under construction, located at Plum Creek Parkway and Emerald.

o                     Red Hawk, construction document review, single-family subdivision located south of Melting Snow Way and east of Bent Wedge Point.

o                     Terrain Sunstone Village, construction, single-family home development located south of intersection of State Highway 86 and Autumn Sage.

o                     Terrain Upper Sunstone, construction documents, single-family home development located south of State Highway 86 and just east of King Soopers/Ridge Road.

o                     The Oaks Filing 3, site construction, 117 single-family lots located on South Ridge Road directly west of Appleton Way.