File #: WC 2019-109    Version: 1 Name:
Type: CR Water Topic Status: Motion Approved
File created: 12/3/2019 In control: Castle Rock Water Commission
On agenda: 12/11/2019 Final action: 12/11/2019
Title: Resolution Approving a Services Agreement with Olsson, Inc. for the East Plum Creek Reach 5 Phase II Stabilization Project Town Council Agenda Date: January 7, 2020
Attachments: 1. Attachment A: Reso Olsson EPC 5 Ph II 010720-draft, 2. Exhibit 1: Services Agreement Olsson EPC 5 Ph II, 3. Attachment B: EPC 5 Ph II-Site Map

To:                     Members of the Castle Rock Water Commission

 

From:

                     Mark Marlowe, P.E., Director of Castle Rock Water

                     

Title

Resolution Approving a Services Agreement with Olsson, Inc. for the East Plum Creek Reach 5 Phase II Stabilization Project

 

Town Council Agenda Date: January 7, 2020

Body

________________________________________________________________________________

 

Executive Summary

 

Castle Rock Water is seeking Town Council approval of a Resolution (Attachment A) awarding a Services Agreement (Exhibit 1) to Olsson, Inc. for the East Plum Creek (EPC) Reach 5 Phase II Stabilization Project in the amount of $261,284, plus a 10% Town-managed contingency in the amount of $26,128, for a total project authorization of $287,412.  This project is funded through the Stormwater, Water Resources and Wastewater Enterprises and is located near the Plum Creek Water Purification Facility (PCWPF) and the Town’s Central Service Center. The scope of work generally includes survey, alternative analysis, preliminary and final design, environmental permitting and FEMA Conditional Letter of Map Revision (CLOMR) approval for stream stabilization improvements.  Channel stabilization is key for long-term protection of critical water and sewer infrastructure.  Reach 5 Phase II is generally located east of I-25 approximately 800’ downstream of the existing pedestrian crossing to the Town limits approximately 700’ upstream of the crossing (Attachment B).  Engineering services are anticipated to be complete by December 31, 2020; however, federal permitting is not expected to be obtained until 2021. 

 

This project is part of a broader effort to address legacy Stormwater needs in the Town. Castle Rock Water is working on a Stormwater bank loan for $9.5M to be taken in 2020 to address these needs.

 

Notification and Outreach Efforts

 

The project is located within Town owned open space. Staff will provide notifications via direct mailings to adjacent property owners, news releases and social media postings, as needed. Project details and updates will be provided on CRgov.com/water.

 

 

History of Past Town Council, Boards & Commissions, or Other Discussions

 

This project was identified in the East Plum Creek Watershed Master Plan Preliminary Design Report (Master Plan), adopted by Council through Resolution No. 2009-03 on January 6, 2009.

 

Discussion

 

The Town has multiple objectives to be achieved through channel stabilization along Reach 5 of EPC that include but are not limited to:

 

                     Preserve and enhance the riparian and wetland corridor by incorporating more natural designs and features where possible that complement the natural and geological environment.

                     Reduce channel slope and erosive velocities to restore a sustainable channel system for water quality and flood control.

                     Protect existing infrastructure, including the CR-1 Diversion, sanitary sewer interceptor, EPC trail and adjacent property, by reducing channel erosion and migration during flood events.

                     Restore original design grade above sanitary sewer interceptor, to the extent practicable.

                     Minimize magnitude of construction impacts by protecting existing trees and vegetation where possible.

                     Identify opportunities for permanent maintenance access from the existing trail to proposed channel improvements that fits the existing and constructed riparian corridor.

                     Secure federal approvals for floodplain, endangered species and wetland impacts in a cost effective manner while ensuring environmental compliance and reducing public hazards.

                     Incorporate additional stakeholder input as warranted and allowable by budget.

 

Specific objectives to be achieved through channel stabilization at the CR-1 Diversion include, but are not limited to:

                     Armor and protect structure to prevent undermining and channel migration away from screened section; prevent catastrophic failure, to the extent practicable.   

                     Direct flows over screened section to optimize water intake.

                     Minimize sediment deposition on screened section.

 

Due to the length of Reach 5, stabilization will occur in multiple phases.  Reach 5 Phase III and IV project limits are generally between Meadows Parkway and North Meadows Drive.  Additional Reach 5 project phases are also planned between Meadows Parkway and Wolfensberger Road. 

 

This project will be split into three major design phases including: I) project survey, site investigation and alternatives analysis, II) preliminary design, and III) final project design.

 

The Town issued a Request for Proposals (RFP) via Rocky Mountain BidNet, and four (4) responses were received.  A selection committee consisting of David Van Dellen, Barbara Horton, and Jeanne Stevens reviewed and ranked each proposal based on a weighted set of criteria included in the RFP document.  Following the qualification based selection process, the fee schedule for each firm was opened and reviewed, “not for low bid, but for a reasonable and appropriate level of effort from each team member.”  The four fee schedules ranged from $206,437 to $294,056.  The top ranked firm in terms of qualifications, response to scope of work, pricing, understanding of project and team experience was Olsson, whose proposal represented the best overall value for the services requested. 

 

Budget Impact

 

Funds for this services agreement will be charged to the Stormwater, Water Resources and Wastewater accounts below.  Total requested authorization, including contingency, is $287,412.       

 

Fund

Account Number

Total

Cont.

Auth.

Budget

SW - EPC Stream Stabilization

212-4475-444.76-37

$156,770

$15,677

$172,447

 

WR - CR-1 Diversion

211-4375-443.79-16

$65,321

$6,532

$71,853

$75,000

WW - Sewer Line Rehab

213-4575-445.75-62

$39,193

$3,919

$43,112

$500,000

Total

$261,284

$26,128

$287,412 

 

 

Stormwater funds for this project were not included in the 2020 budget; however, East Plum Creek has been identified as a Legacy Project to be funded through the Stormwater bank loan.  Appropriation of the required funds will be accounted for in the first quarter budget amendment.  The Water Resources and Wastewater amounts will be funded through available 2020 budget.   

 

The total multi-year expenditures for this project are as follows:

 

Engineering & Permitting

Bid & Const Support Estimate

Construction  Estimate

Total Estimate

$ 261,284

$ 60,000

    $ 2,500,000 *

$ 2,821,284 *

* Costs subject to change based on selected alternative.

 

Staff Recommendation

 

Staff recommends Town Council approval of a Resolution awarding a Services Agreement to Olsson, Inc. for the East Plum Creek Reach 5 Phase II Stabilization Project in the amount of $261,284, plus a 10% Town-managed contingency in the amount of $26,128, for a total project authorization of $287,412. 

 

 

Proposed Motion

 “I move to recommend to Town Council approval of Resolution as presented

 

 

Attachments

 

Attachment A: Resolution

Exhibit 1: Services Agreement

Attachment B: Site Map