Castle Rock Banner
File #: RES 2019-043    Version: 1 Name:
Type: Resolution Status: Passed
File created: 3/5/2019 In control: Town Council
On agenda: 4/16/2019 Final action: 4/16/2019
Title: Resolution Approving a Construction Contract with Rocky Mountain Excavating, Inc. for the Construction of the Metering and Control Facility as part of the Lanterns Well Project [South of Crystal Valley Parkway in the Lanterns Planned Development]
Attachments: 1. Attachment A: Resolution, 2. Exhibit 1: Contract, 3. Attachment B: Map

To:                     Honorable Mayor and Members of Town Council

 

From:                     Mark Marlowe, P.E., Director of Castle Rock Water

 

Title

Resolution Approving a Construction Contract with Rocky Mountain Excavating, Inc. for the Construction of the Metering and Control Facility as part of the Lanterns Well Project [South of Crystal Valley Parkway in the Lanterns Planned Development]

Body

________________________________________________________________________________

 

Executive Summary

 

The purpose of this memorandum is to request Town Council’s approval of a Resolution (Attachment A) for a construction contract with Rocky Mountain Excavating, Inc. (RME) for the construction of a metering and control facility for the Lanterns Well project.  The Lanterns Well project includes the construction of three new Denver Basin wells that will supply water to the Plum Creek Water Purification Facility (PCWPF), well metering and control facilities, and a transmission pipeline. The new wells will help to firm the supplies from the existing Denver Basin infrastructure.  Staff recommends approving a construction contract with RME in the amount of $619,871.36.  In addition, Castle Rock Water staff requests a ten percent Town-managed contingency in the amount of $62,000, for a total authorization of $681,871.36.  The construction contract is included (Exhibit 1).

 

History of Past Town Council, Boards & Commissions, or Other Discussions

 

This item was presented at the Castle Rock Water Commission on March 27, 2019, and the commission voted unanimously to recommend approval to Town Council.

 

Discussion

 

Based on the Water Resources Supply Demand Model, the high population growth trend, the last two summer water demand seasons, and aging well infrastructure, additional water supply is needed to keep pace with increased water demands and to firm supplies. The new well infrastructure will help firm and increase current supplies.

 

The new Lanterns Well Facility will be located south of Crystal Valley Parkway, on a parcel that is to be dedicated to the Town for the purpose of developing a well facility.  A project location map has been provided (Attachment B).  The overall project includes three new Denver Basin Aquifer wells (currently under construction), controls and metering facilities at the site, and a transmission pipeline to convey the water to the Plum Creek Water Purification Facility. Staff anticipates that this facility will produce an estimated range between 1 million gallons per day (MGD) to 1.5 MGD, with an average of 1.2 MGD of raw water supply for the Town. 

 

This memorandum is to request approval of a construction contract with RME to construct the well metering and control facilities for the Lanterns Wells.  The project was designed by Dewberry Engineers, Inc.  The invitation to bid was sent to eight qualified contractors.  Bids were received from four contractors, as summarized in the table below.  The Engineer’s estimate was $750,000.  The low bid was received by RME and is considered a responsive bid.

 

Consultant

Bid Amount

RME

$619,871.36

RN

$659,000.00

T. Lowell

$700,000.00

Reynolds

$1,029,250.00

Fiore

No Bid

Garney

No Bid

53 Corp.

No Bid

PCL

No Bid

 

 

Budget Impact

 

Funds for this project are available in the 2019 budget under the “New Water Supply Well” (Account No. 210-4275-442.75-39) account. RME’s bid is $619,871.36. Staff requests a Town-managed contingency in the amount of $62,000 for a total project authorization of $681,871.36.

 

Project                                            Amount                     Contingency                          Total

New Water Supply Well                     $619,871.36                          $62,000                     $681,871.36

 

A summary of project expenditures to-date is shown below. 

 

Contractor                     Expenditure

Hydro Resources                     $3,891,138.00

Leonard Rice                      217,822.00

Dewberry                                           180,674.00

Hudick                                           131,147.00

Global (pre-purchase of pipe)                      15,810.00

Global                                           282,206.00

RME                                             619,871.36

Total                     $5,338,668.36

 

Staff Recommendation

 

Staff recommends Council’s approval of the resolution approving a construction agreement between the Town of Castle Rock and RME for construction of the Lanterns Well metering and control facilities in the amount of $619,871.36, plus a ten percent Town-managed contingency of $62,000, for a total authorization of $681,871.36. 

 

Proposed Motion

 

“I move to approve the Resolution as introduced by title.”

 

Attachments

 

Attachment A:                     Resolution

Exhibit 1:                                          Contract

Attachment B:                     Map