Title: Resolution Approving a Construction Contract between the Town of Castle Rock and Global Underground Corporation for the Prairie Hawk PRV Upgrade Project [Generally following East Plum Creek through Town] Town Council Agenda Date: December 19, 2023
Attachments: 1. Attachment A: Resolution, 2. Exhibit 1: Agreement, 3. Attachment B: Location Map.pdf
Related files: RES 2023-147

To:                     Members of the Castle Rock Water Commission

 

From:                     Mark Marlowe, P.E., Director of Castle Rock Water

                     Roy Gallea, Engineering Manager

                     Matthew Hayes, Technical Engineering Manager

                     

Title

Resolution Approving a Construction Contract between the Town of Castle Rock and Global Underground Corporation for the Prairie Hawk PRV Upgrade Project [Generally following East Plum Creek through Town]

Town Council Agenda Date: December 19, 2023

Body

________________________________________________________________________________

 

Executive Summary

 

Castle Rock Water is seeking Town Council approval of a resolution (Attachment A) approving a construction contract (Exhibit 1) with Global Underground Corporation (Global) in the amount of $538,921 along with a 10% staff-managed contingency of $ 53,892, for a total authorization of $592,813 to complete construction of the Prairie Hawk Pressure Reducing Valve (PRV) Upgrade Project.

 

The Prairie Hawk PRV Project is located generally along East Plum Creek between the Plum Creek Water Purification Facility and the Lanterns Subdivision addressing various upgrades to the existing raw water transmission main. The PRV is located at Prairie Hawk Drive near the intersection with Switchgrass Drive (Attachment B).  The project will replace an existing Pressure Sustaining Valve (PSV) with a new valve vault and redundant valve, add multiple fire hydrants for maintenance access to the line, redirect well water from the Red Hawk Golf Course area to advanced treatment and relocation of the line due to conflicts with new development activity.  The existing PSV must be taken out of service frequently for cleaning due to high iron within the raw water.  This requires that all of the southern wells feeding Plum Creek Water Purification Facility be taken out of service during the maintenance.  The new PRV vault will include a larger PRV to eliminate the restriction and a second valve to allow for maintenance.

 

Notification and Outreach Efforts

 

Staff will follow the Town’s communication policy with regard to impacts due to noise and traffic during construction activities.  All work is being performed on Town of Castle Rock property and/or easements.

 

 

 

Discussion

 

The southern raw water transmission main that supplies water to the Plum Creek Water Purification Facility (PCWPF) from wells in the southern part of the Town was constructed with a PSV that maintains a minimum pressure in the transmission main to prevent negative pressure conditions in the high point of the pipeline.  The PSV was sized as an 8-inch valve.  In 2020, the Lanterns Well Field was added to the pipeline.  The 8-inch valve is now acting as a restriction in the line, limiting the flows from the southern wells.  Additionally, the high iron load in the water periodically clogs the PSV's pilot lines.  Cleaning the pilot lines requires operations to shut down the southern well field.  The new PRV vault will include a larger PRV to eliminate the restriction and a second valve to allow for maintenance. 

 

The existing 8-inch PRV is located in a 6-foot manhole.  The existing valve also has some pitting due to cavitation in the valve.  The plan is to remove and replace the manhole and PRV with a new vault and parallel PRV’s.  The two valves will allow operational redundancy and the new vault will allow for easier access to the PRV’s for maintenance.  Capacity issues in the southern raw water transmission main will be evaluated with the planning and design of the PCWPF expansion. 

 

The project also includes a lowering of the existing reuse main in Meadows Filing 19.  A portion of the existing reuse main was installed outside of an existing utility easement due to some structural conflicts.  The development plan for that site has the existing reuse main running through a detention pond.  The grading for the pond has removed the cover for the main and it needs to be shifted into the bank of the pond to maintain proper bury depth.  The Town is responsible for the main relocation, since it is not located within the Town’s easement. 

 

The project also includes the installation of seven new hydrants along the raw water transmission main.  The hydrants will be used for monitoring the pressures along the transmission main in the event of a blockage.  They will also be used for flushing and “ice pigging” operations to remove iron deposits within the main.

 

Well 176 is located at the Red Hawk Golf Course.  Once the reuse main was installed to send reuse water to the golf course from the Plum Creek Water Reclamation Authority (PCWRA), Well 176 was plumbed to supply water to the Meadows Water Treatment Plant (MWTP).  Based on water quality tests, the water from Well 176 is high in naturally-occurring radionuclides.  Operations has determined that the water cannot be treated at the MWTP.  The contract will connect the water main from Well 176 into the raw water main that supplies water to PCWPF.  The higher flows into PCWPF and advanced treatment process can effectively treat the water quality concerns from Well 176.

 

Budget Impact

 

The Prairie Hawk PRV Upgrade project was designed by CR Water staff.  The invitation to bid document was sent to five qualified contractors.  Contractors are pre-qualified for projects annually through a request for qualifications that are advertised on BidNet.  Bids were received from three contractors, as summarized in the table below.  The Engineer’s estimate was $539,000.  The low bid was received from Global Underground and is considered a responsive bid.

 

 

Company

Bid

Global

$538,921

RME

$652,449

Velocity

$836,252

53 Corp.

No Bid

C&L

No Bid

 

Funding for this project is available in the approved 2023 budget.  The project will be funded from the Water Resources - Repair & Maintenance - Pipelines (Account No. 211-4345-443-40-38).  A budget transfer of $600,000 from Water Resources - Engineering - Other Professional Services, account number 211-4340-443-30-70 will be used to cover the shortfall.

 

Staff Recommendation

 

Staff recommends Town Council’s approval of the contract between the Town of Castle Rock and Global Underground, for the construction of the Prairie Hawk PRV in the amount of $538,921 plus a 10% Town-managed contingency of $53,892 for a total authorization of $592,813.

 

Proposed Motion

 

“I move to recommend Town Council approval of the Resolution mentioned above.”

 