File #: WC 2025-066    Version: 1 Name:
Type: CR Water Topic Status: New Agenda Topic
File created: 6/30/2025 In control: Castle Rock Water Commission
On agenda: 7/23/2025 Final action:
Title: Resolution Approving the Construction Contract between the Town of Castle Rock and Garney Companies Inc. for the Ray Waterman Raw Water Raw Water Treatment Center (RWRWTC) and Bell Mountain Ranch (BMR) LAS Conversion Project - Work Package #2 [Ray Waterman Regional Water Treatment Center and Bell Mountain Ranch Water Treatment Plant] DRAFT Town Council Agenda Date: August 19, 2025
Attachments: 1. Attachment B: Location Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo/Audio
No records to display.

To:                     Members of the Castle Rock Water Commission

 

From:                     Mark Marlowe, P.E., Director of Castle Rock Water

                     Roy Gallea, P.E., Engineering Manager

                     Emily Huth, P.E., Project Manager

                     

Title

Resolution Approving the Construction Contract between the Town of Castle Rock and Garney Companies Inc. for the Ray Waterman Raw Water Raw Water Treatment Center (RWRWTC) and Bell Mountain Ranch (BMR) LAS Conversion Project - Work Package #2 [Ray Waterman Regional Water Treatment Center and Bell Mountain Ranch Water Treatment Plant] DRAFT

Town Council Agenda Date: August 19, 2025

Body

________________________________________________________________________________

 

Executive Summary

 

Castle Rock Water (CRW) staff requests approval of a Construction Contract (Attachment A) with Garney Companies (Garney) to complete construction of liquid ammonium sulfate (LAS) chemical conversion projects at the Ray Waterman Regional Water Treatment Center (RWRWTC) and the Bell Mountain Ranch Water Treatment Plant (BMR). This project is being completed in two work packages. Work Package 1 was previously approved for $1,199,662 and is for procurement of long lead equipment. Work Package 2 is $XXX and is for the balance of work to complete the project.

 

History of Past Town Council, Boards & Commissions, or Other Discussions

 

CRW Staff presented Work Package 1 to the CRW Water Commission on June 25, 2025, The Commission voted unanimously 7 to 0 to recommend Council approval of the resolution as presented. Work Package 1 was approved by Town Council on July 1, 2025.

 

Discussions

 

This contract will include scope at two of the Town’s treatment facilities: RWRWTC and BMR. The work at BMR includes installation of a new liquid ammonium sulfate (LAS) chemical feed system, resulting in the switch from free chlorine to chloramines as the disinfectant in the BMR system to align with the rest of the Town’s water distribution system. The work at RWRWTC will include conversion of the existing anhydrous ammonia chemical system to a liquid ammonium sulfate (LAS) chemical system to improve safety and align with chemicals being used at other facilities in the system. The location of the conversion from free chlorine to chloramines will be modified in the facility to improve operational flexibility and allow the Town to receive WISE flows even when RWRWTC is taken offline.

 

The flowrates CRW receives from WISE are determined by Aurora Water and CRW must take the water, or pay a fee for not receiving it (known as WISE take-or-pay). CRW is slated to receive higher WISE flows during the 2025/2026 lower demand season (i.e. winter months), which is a trend that is expected to continue in future years. Additionally, CRW is now receiving and transmitting all of Dominion’s WISE and Aurora water supplies through this connection. In the future, CRW will also have additional imported supplies coming into our system at RWRWTC. CRW staff have determined the RWRWTC LAS Conversion project is an emergency project to complete as efficiently as possible during the 2025/2026 low demand season to minimize the take-or-pay fees associated with not being able to receive WISE water when RWRWTC must be taken offline - whether for expected routine maintenance, planned construction projects, or unexpected/emergency repairs.

 

It is preferred that as much of the construction work be completed as possible in the month of November 2025 because that is when WISE flows will  not be provided to CRW. This project will also include some Supervisory Control and Data Acquisition (SCADA) improvements that were originally going to be completed as part of the SCADA Phase V project at RWRWTC. The LAS Conversion cannot be completed without completing some upgrades to the SCADA system, instrumentation, and programming that was originally going to be completed in the SCADA Phase V project. Including a portion of the SCADA work within the LAS Conversion project will help to prevent rework and additional costs.

 

Given the emergency status of this project, and complexity of coordinating this project with other concurrent projects occurring at RWRWTC, Garney was recommended and selected via sole-source for Work Package 1. Contracting with Garney for procurement of the long lead equipment before receiving pricing for the balance of work was necessary to keep the project moving as closely to the desired schedule as possible. Garney submitted a price for Work Package 2 of $X,XXX,XXX that will be for the balance of the work at both facilities.

 

Budget Impact

Funding to complete construction of the entire RWRWTC & BMR LAS Conversion project, including Work Package 2, will be provided from three different accounts - listed in the table below.

 

Project

Account Number

Budget

Chloramine & WISE Modifications at RWWTC

211-4375-443.77-72

$1,600,000

Bell Mountain Ranch WTP LAS Conversion

210-4275-442.79-33

$500,000

SCADA System Improvements

210-4275-442.75-41

$1,150,000

Total

 

$3,250,000

 

Garney’s proposed cost to complete Work Package 2 is $X,XXX,XXX Staff recommends including a 10% Town managed Contingency resulting in a total authorization amount of $X,XXX,XXX.

 

Contract

Garney Contract Amount

Town Managed Contingency (10%)

Authorization Amount

Work Package 2 Construction Contract (Garney)

$X,XXX,XXX

$XXX,XXX

$X,XXX,XXX

 

Three major components will be funded from the accounts listed above. Those include Work Package 1 Construction Contract (early procurement), Work Package 2 Construction Contract (balance of work), and the Construction Engineering Services. Garney is currently under contract for Work Package 1, and BMcD is recommended for  the construction engineering services. CRW plans to present BMcD’s construction engineering services Contract and Garney’s Work Package 2 Construction contract together. The summary table below is included for reference (not all proposed costs are known at this time).

 

Contract

Status

Authorization Amount

Work Package 1 Construction Contract (Garney)

Approved

$1,319,628

Work Package 2 Construction Contract (Garney)

Under Consideration

$X,XXX,XXX

Construction Engineering Services (BMcD)

Under Consideration

$298,096

Total

$X,XXX,XXX

 

Proposed Motion

 

“I move to recommend to Town Council approval of the Resolution as presented

 

 

Attachments

 

Attachment A:                     Resolution (Not Attached)

       Exhibit 1:                     Construction Agreement (Not Attached)

Attachment B:                     Location Map