Castle Rock Banner
File #: ID 2019-066    Version: 1 Name:
Type: Department Updates Status: Manager's Report
File created: 6/5/2019 In control: Town Council
On agenda: 6/18/2019 Final action:
Title: Development Services Project Updates
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo/Audio
No records to display.

To:                     Honorable Mayor and Members of Town Council

 

From:                     Bill Detweiler, Director of Development Services

 

Title

Development Services Project Updates

Body

________________________________________________________________________________

 

Executive Summary

 

The high growth nature of Castle Rock results in numerous and diverse questions with individuals seeking information about existing conditions and future plans. All community development activity information is located on the Town website under the Development Activity link and In Your Backyard interactive map.

 

Town staff is always available to meet with interested parties to review existing zoning and development plans and review proposed projects submitted for Town review. Staff can also assist with inquiries that have not been submitted as formal applications. Staff spends a considerable amount of time working with residents and development teams before formal submittals occur and can provide information on such inquiries.

 

1.                     Quasi-Judicial Applications Requiring Public Hearings:

 

418 N Lewis Street

The property owner of 418 North Lewis Street, George Usleber, submitted a Use by Special Review application for a new two story garage that includes an accessory dwelling unit. The first story contains two parking spaces and a workshop within 990 sq. ft. The accessory dwelling unit occupies the entire second story within 800 sq. ft. Accessory dwelling units built within new structures require Use by Special Review approval with public hearings before Planning Commission and Town Council. The project is within the Craig & Gould neighborhood so approval from the Historic Preservation Board is also required. The project is in Councilmember Bower’s district.

2.                     General Inquiries in the Town or within the County:

 

PPI for Meadows Town Center Rock Climbing Facility

Roth Lang Engineering Group on behalf of Ubergrippen is seeking feedback on an 18,000 sq. ft. indoor climbing facility located on a 1.5-acre tract between Future and Bilberry Streets in the Meadows Town Center. Ubergrippen is a full service, family friendly, indoor climbing business with an existing location in northeast Denver. The proposal includes an 8,000 sq. ft. climbing hall with a 50 ft. tall climbing wall, bouldering field, cardio, fitness, and yoga studio with an open green space and fire pit for activities and events. This is not a formal land use application, so timing of the proposal is unknown. The proposal is located in Councilmember Bracken’s District.

3.                     Development Activity:

 

Site Development Activity/Commercial

 

                     Promenade:

o                     Whole Foods, site and building construction, located southeast of Promenade Parkway and Castle Rock Parkway.

o                     La Loma Restaurant, site and building construction, located southwest of Promenade Parkway and Castle Rock Parkway.

o                     Premier Members Credit Union, site construction, located southwest of Promenade Parkway and Castle Rock Parkway.

o                     Panda Express, site plan review, located west of Sam’s Club on the east corner of Promenade Parkway and Factory Shops Blvd. intersection.

o                     Retail building, site construction, located west of Sam’s Club on the east corner of Promenade Parkway and Factory Shops Blvd. intersection.

 

                     Meadows:

o                     Collaboration Campus, site construction, located north of the hospital and south of the high school. 

o                     IREA Substation, construction documents under review, located east of Castle View High School and ACC Collaboration Campus.

o                     Jiffy Lube, construction plans under review, located north of Meadows Parkway and Lombard Street intersection.

o                     Medical office building, site development plan, located at Prairie Hawk and Dacoro Lane.

o                     North Meadows Parkway, roundabout construction documents for future intersection located north of Castle View High School between the two bridges, providing access to the future commercial-office-industrial parcels on each side of North Meadows Pkwy.

o                     Tommy Carwash, site and building construction located north of Meadows Parkway and Lombard Street intersection.

o                     Town Center:

§                     Canvas Credit Union, site construction, located at Meadows Boulevard and Future Street.

§                     Mixed-use 17,000 sq. ft. building, site construction, located on Ambrosia St.

§                     Park area site plan, located between Viridian and Saffron Streets.

o                     Water line, construction adjacent to North Meadows Parkway between State Highway 85 and East Plum Creek.

o                     Meadows Town Center, site development plan for mixed use, restaurant, and 111 multi-family residential units, located at northeast corner of Bilberry St. & Mercantile St.

 

                     Downtown:

o                     Encore (formally named Festival Park Commons), site plan under review, northeast of Wilcox Street and South Street intersection.

o                     Riverwalk North and South buildings are under construction on Wilcox Street and a temporary Certificate of Occupancy permit was issued for the south building.

o                     Rock Park, re-platting under review, located north of downtown.

o                     Iron Mule Brewery, patio improvements for Acme Water Tower building located at Perry and 6th Street.

 

                     Other Commercial Projects throughout Town:

o                     Brookside Skilled Nursing, construction documents under review for new 29,000 square-foot facility on South Perry Street, southwest of Safeway.

o                     Castle Rock Automotive, site construction for automotive service building and flex use building on the northeast corner of South Perry Street and I-25 frontage road.

o                     Castle Rock Health Campus, site grading for new 32-bed skilled nursing facility located on S. Perry Street.

o                     Castle Rock Industrial Park, site and building construction for office, warehouse and flex space, located at the northwest intersection of State Highway 85 and Liggett Road.

o                     Convenience Store and retail space, site plan under review for 7,200 square-foot building and fuel island, located at southeast corner of Plum Creek Parkway and Lake Gulch Rd.

o                     Crystal Valley Ranch, revisions to landscaping plans located west of West Loop Road and River Oaks Street.

o                     Founders Marketplace, Canvas Credit Union site construction and Liberty Express Carwash site plans, northeast of Fifth Street and Founders Parkway.

o                     Garage Condos, site construction, located on Liggett Road.

o                     Heckendorf Ranch, 10,000 square-foot retail site plan under review, located southwest of Crystal Valley Parkway and Plum Creek Boulevard, directly south of Fire Station No. 152.

o                     Infinity Laboratories, parking lot expansion construction document review, located at 1585 S. Perry.

o                     Starbucks, site and building construction located on southeast corner of Wolfensberger Road and Kinner Street.

o                     The Famous Steak House, site development plan and interior building renovation, located in former Jarre Creek Brewery building south of Chili’s.

o                     Town of Castle Rock Public Works Service Center expansion construction documents under review, located at 4175 S. Castleton Court.

o                     Town of Castle Rock Water, construction plans for water plant expansion located southwest of Liggett Road and I-25.

o                     Miller’s Landing phase 1 infrastructure construction plans under review for future commercial development site, located on Plum Creek Parkway east of PS Miller Park.

o                     Montana Vista, site plan under review for 18,000 square-foot building, located at Alexander Place and Brewer Court.

o                     U-Haul self-storage, site-grading construction located on I-25 East Frontage Road north of South Perry Street and Manatt Court.

 

                     Site Development Activity/Residential:

o                     Crystal Valley Ranch, construction documents for single-family subdivisions, located in southern interior portion of Loop Road and between West Loop Road and the Lanterns property.

o                     Founders Village, attached single-family home neighborhood, construction documents under review and site grading underway, located northeast of Mikelson Blvd. and Mitchell Street, southeasterly of Mesa Middle School.

o                     Founders Village The Enclave, site plan and construction documents under review for 88 additional townhomes to complete the existing development located at Enderud and Wagonwheel.

o                     Lanterns, site construction for main collector looped roadway Montaine Boulevard and construction documents under review for two neighborhoods, located south of Montaine Boulevard (south of King’s Ridge subdivision).

o                     Liberty Village, construction documents for single-family lots located on the north side of Castle Oaks Drive.

o                     Liberty Village, bridge crossing on Castle Oaks Drive and McMurdo Gulch channel improvements.

o                     Meadows, construction for 209 single-family lot subdivision located just north of Red Hawk subdivision, west of Prairie Hawk Drive.  This work includes reconstruction of a portion of Red Hawk Drive, which is completed except for detached sidewalk on east side, immediately north of golf course area.

o                     Meadows Deputy Zach S. Parrish III Memorial Park, construction documents located west of Fiddle Rd.

o                     Meadows, Town Stormwater Project, construction of underdrains adjacent to Starry Night Loop and Hourglass Ave.

o                     Meadows, Springs multi-family apartment complex site plan, located at corner of Bilberry and Viridian.

o                     Meadows Town Center, construction documents for single-family subdivision, located north of Meadows Blvd. between Low Meadow and Trail Blazer.

o                     Meadows, 57 single family attached neighborhood, site plan under review, located on east and west sides of Coachline Road, just north of intersection with Wolfensberger Road, adjacent to Ridgeline Open Space

o                     Plum Creek Fairway 9, construction documents for single-family subdivision, located on Emerald Drive south of the Plum Creek Golf Course clubhouse.

o                     Plum Creek Ridge Townhomes, under construction, located at Plum Creek Parkway and Emerald.

o                     Terrain Sunstone Village, single-family home development located south of intersection of State Highway 86 and Autumn Sage.

o                     Terrain Upper Sunstone, construction documents for single family home development located south of State Highway 86 and just east of King Soopers/Ridge Road.

o                     The Oaks Filing 3, site construction for 117 single-family lots, located on South Ridge Road directly west of Appleton Way.