Legislation Details

File #: WC 2026-054    Version: 1 Name:
Type: CR Water Topic Status: New Agenda Topic
File created: 4/21/2026 In control: Castle Rock Water Commission
On agenda: 5/27/2026 Final action:
Title: Resolution Approving an Equipment and Services Acquisition Agreement between the Town of Castle Rock and XXX for Phase VI of the SCADA Master Plan Design Project [Entire CRW service area] DRAFT Town Council Agenda Date: June 16, 2026
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo/Audio
No records to display.

To:                     Members of the Castle Rock Water Commission

 

From:                     Mark Marlowe, P.E., Director of Castle Rock Water

                     Shawn Griffith, Assistant Director of Operations

                     Nicolas Van Kooten, P.E., SCADA Superintendent

                     

Title

Resolution Approving an Equipment and Services Acquisition Agreement between the Town of Castle Rock and XXX for Phase VI of the SCADA Master Plan Design Project [Entire CRW service area] DRAFT

Town Council Agenda Date: June 16, 2026

Body

________________________________________________________________________________

 

Executive Summary

 

Castle Rock Water (CRW) staff requests Town Manager approval for a services agreement with xxx for assistance in creating the SCADA MP Phase VI Meadows and Remotes Sites System Design and Bid Phase Services project, for the not-to-exceed amount of $xxx, with a 10% Town managed contingency of $xxx, for a total authorization request of $xxx (see Attachment A).

 

The table below shows the total approved expenditures to date on the SCADA MP by vendor: 

 

 

I would like to add a summary of each phase of the SCADA MP here and status.

 

The SCADA system is crucial to the security and efficient operation of CRW's water and wastewater facilities. In 2019, the SCADA Master Plan (MP) was completed to assess the system and develop a plan for its upgrade, maintenance, and operation. The Town Council approved the SCADA MP on December 17, 2019, which identified approximately $12 million in expenditures over seven years.

 

In late 2023, the SCADA MP implementation cost was reviewed and updated, revealing a 26% increase in equipment and implementation costs since 2019. Additionally, the update included newly identified work not previously covered in the 2019 scope. As a result, the revised estimated cost for full implementation of the plan over the next six years is approximately $24.5 million.

Notification and Outreach Efforts

 

This project is security-sensitive, and no public outreach is planned. Work will be performed at various CRW water treatment facilities and will be done out of the public eye.

 

Discussion

 

An engineering consultant is required to develop a comprehensive SCADA system design for Phase VI of the MP, including upgrades to the Meadows Water Treatment Plant (Meadows) and 17 remote sites. The scope of work for this project encompasses a complete SCADA system and electrical drawings; detailed scopes of work (SOW); equipment and Input/Output (I/O) lists; Process and Instrumentation Diagrams (P&ID) drawings; network diagrams; and site-specific control narratives. These deliverables are essential to ensure an accurate project estimate and proper implementation details. Additionally, the project will include bid-phase services.

 

Staff submitted a Request for Proposal (RFP) to two qualified consultants in April of 2026, as shown in the chart below:

 

Consultant

Proposal Cost

Burns & McDonnell Engineering

$xxx

Tetra Tech

$xxx

 

Staff recommends selecting XXX as the design consultant for the MP Phase VI project. xxx is a preferred engineering consultant and has submitted a comprehensive quote detailing all the deliverables requested in the original Request for Proposal (RFP). The items outlined in their proposal are critical to the success and efficient execution of the MP Phase VI project.

 

xxx has extensive experience providing key consulting services for various segments of the SCADA MP and has participated in multiple SCADA MP RFPs. Their team has been consistently relied upon for their expertise on numerous related projects. Additionally, their principal engineers and technical staff will be pivotal in the Phase VI design.

 

Given the security-sensitive nature of the Cybersecurity portion of the MP, XXX

has signed a non-disclosure agreement with the Town to ensure confidentiality and protect sensitive information.

 

XXx will conduct site investigations at each facility listed below in collaboration with staff. Based on these investigations, a scope of work (SOW) will be developed and summarized for bid inclusion, detailing the identified work at each facility:

                     Meadows Water Treatment Plant

                     Diamond Ridge Pump Station

                     Crystal Valley Pump Station / Tank 15

                     Tank 8

                     Tank 11

                     Meadows 5 Lift Station

                     Meadows 15 Lift Station

                     Meadows 17 Lift Station

                     Meadows A-1

                     Meadows A-2

                     Meadows A-3

                     Meadows A-4

                     Meadows A-5

                     Meadows A-7

                     Meadows A-8 (Well 49 only)

                     Meadows A-11

                     Meadows A-12 (ASR Wells)

                     Meadows A-13

 

This project will also include the following deliverables:

                     Site investigations and data gathering

                     Progress meetings and project management

                     Technical Memorandum summarizing the SOW for each site

                     SCADA programmable logical control (PLC) cabinet design requirements and drawings

                     Individual Control Narratives for each site

                     New P&ID drawings for each site, aligned with CRW standards

                     Electrical site plans

                     Instrumentation lists

                     Input/Output (I/O) lists

                     Electrical lists

                     Network diagrams

                     Design and project scope documents

                     Bid Phase services

 

xxx has submitted a target completion date of xxx, 2026. Upon completion of the design phase, they will assist with bid-phase activities, including vendor selection and contractor award-related tasks.

 

Budget Impact

 

Funds have been budgeted each year, through 2026 for the Master Plan Implementation. Funds for this project will be taken from the Water, Water Resources and Wastewater CIP SCADA System Improvements line items as follows:

 

Fund Name

Account Number

Cost

2026 Account Balance

Water SCADA System Improvements

210-4275-442.75-41

$xxx

 $1,182,745

Water Resources SCADA System Improvements

211-4375-443.75-41

$xxx

-$654,913

Wastewater SCADA System Improvements

213-4575-445.75-41

$xxx

$537,824

Total

 

$

$

 

Staff Recommendation

 

Staff recommends a services agreement withto create the SCADA MP Phase VI Meadows and Remote Sites System Design and Bid Phase Services project, for the not to exceed amount of $xxx, with a 10% Town managed contingency of $xxx, for a total authorization request of $xxx.

 

Proposed Motion

 

 “I move to recommend to Town Council approval of the Resolution as presented

 

Attachments

 

Attachment A:                      Resolution

        Exhibit 1:                     Contract