Title: Resolution Adopting the 2025-2029 Castle Rock Water Supervisory Control and Data Acquisition (SCADA) Master Plan [Serves entire Castle Rock Water Service Area]
Attachments: 1. Staff Report, 2. Attachment A: Resolution, 3. Attachment B: Cybersecurity Update.pdf, 4. Attachment C: Staffing Update.pdf, 5. Attachment D: SCADA Phase V.pdf, 6. Staff Presentation

To:                     Honorable Mayor and Members of Town Council

 

Through: David L. Corliss, Town Manager

 

From:                     Mark Marlowe, P.E., Director of Castle Rock Water

                     Shawn Griffith, Assistant Director of operations

                     Nicolas Van Kooten, SCADA Superintendent

 

Title

Resolution Adopting the 2025-2029 Castle Rock Water Supervisory Control and Data Acquisition (SCADA) Master Plan [Serves entire Castle Rock Water Service Area]

Body

________________________________________________________________________________

 

Executive Summary

 

This memorandum has been prepared to request Town Council approval of a Resolution to adopt the 2025-2029 SCADA Master Plan (MP), see Attachment A.  The Castle Rock Water (CRW) SCADA MP is the starting point for the development of the CRW SCADA system functional requirements. This 2025-2029 MP addresses updated cybersecurity requirements, Operational Technology (OT) improvements, telemetry modifications, backhaul high speed communications improvements, updated programmable logic controllers (PLCs), and human-machine interfaces (HMIs). During the planning effort, investigations are performed to determine all desired functions, features, and requirements for each subsystem (PLC, HMI, OT, cybersecurity, telemetry, backhaul). In 2024, Tetra Tech was contracted to update the 2019 SCADA MP.  The resulting updated MP identified a number of additional critical projects and programs beyond the recommendations in the 2019 MP to ensure that CRW’s SCADA system continues to meet operational and security needs for CRW’s water and wastewater systems.

 

The table below shows the total approved expenditures to date on the 2019 SCADA MP by vendor: 

 

Project

PO

Vendor

Year

Amount

OWL Data Diode

2171

Rexel

2021

$46,856

SCADA Backhaul & Radio Network Implementation

2252

Techneaux

2022

$1,801,157

PLC Hardware for OT Upgrades

2305

Rexel

2021

$91,066

Starwind Software for OT Server Upgrades

n/a

Starwind

2021

$14,000

PCWPF PLC Replacements

n/a

Rexel

2021

$19,573

Founders WTP & Remote Sites OT Equipment Upgrades

2352

Rexel

2022

$32,905

Founders WTP & Remote Sites PLC Upgrades

2369

Rexel

2022

$51,092

Founders WTP & Remote Sites Display Upgrades

2388

Rexel

2022

$72,912

Dell SCADA Clients for PlantPAX

n/a

One Technology

2023

$21,192

Founders WTP & Remotes Sites Upgrade

2474

Techneaux

2023

$1,954,052

Founders Remote Tanks and Pump Station PLC Equipment

2595

Rexel

2023

$78,568

Meadows WTP Remote Sites PLC Upgrade

2579

Rexel

2023

$77,737

Founders WTP & Remote Sites PLC Upgrades

2602

Rexel

2023

$61,838

OWL Data Diode Package

2666

Rexel

2023

$136,523

Miller & Remotes Sites Design Project

2683

Techneaux

2023

$180,000

P&ID Project

2737

Tetra Tech

2023

$61,032

IP Address Update Project

2765

Tetra Tech

2023

$29,338

SCADA Master Plan Phase IV

2787

Tetra Tech

2024

$90,744

Screen Development

2797

LSI

2024

$302,800

Miller WTP PLC Equipment

2805

Rexel

2024

$124,750

O&M Building PLC Equipment

2833

Rexel

2024

$46,327

OWL Data Diode Renewal & Historian

2843

Rexel

2024

$31,704

Remote Sites Screen Development

2854

LSI

2024

$102,630

RFP for SCADA Master Plan Phase IV

2860

Burns & McDonnell

2024

$79,236

Founders Emergency Programming & Commissioning

2907

Techneaux

2024

$72,450

SCADA Master Plan Phase IV Oversight

2937

Burns & McDonnell

2024

$117,241

SCADA All Hazards Assessment

2979

Tetra Tech

2025

$38,765

Subtotal: Completed Projects to Date

 

 

 

$5,736,488

Phase IV- Miller WTP & Remote Sites Upgrade

pending

LSI

2024

$5,689,632

Total Expenses

 

 

 

$11,426,119

 

The SCADA system is crucial to the security and efficient operation of CRW's water and wastewater facilities. In 2019, the SCADA MP was completed to assess the system and develop a plan for its upgrade, maintenance, and operation. The Town Council approved the SCADA MP on December 17, 2019, which identified approximately $12 million (M) in expenditures over seven years.

 

In late 2023, the SCADA MP implementation cost was reviewed and updated, revealing a 26% increase in equipment and implementation costs since 2019. Additionally, the update included newly identified work not previously covered in the 2019 scope. As a result, the revised estimated cost for full implementation of the plan in 2023 was approximately $15M.  An additional update to the SCADA MP has been completed (2025 SCADA MP).  Implementation costs have continued to rise as additional work requirements have been added.  Total costs are now estimated at $21M with estimated annual expenditures shown below through 2029. 

 

The 2025-2029 SCADA MP identified critical cybersecurity enhancements required for CRW to meet upcoming regulatory requirements from the United States Environmental Protection Agency (US EPA).  These enhancements need to be in progress and certified to US EPA by CRW by December 31, 2025.  The enhancements required by year end include additional staffing.  Costs for this staffing are $342,000 in the first year and have been incorporated into a 1st Quarter Budget Amendment, see Attachment B.  A cybersecurity risk assessment is also required by year end.  Details on that work are provided in Attachment C.  Design and bidding services for Phase V of the SCADA MP capital improvements are addressed in Attachment D.

 

Staff Recommendation

 

Staff recommends the adoption of the 2025-2029 SCADA Master Plan.

 

Proposed Motion

 

“I move to approve the Resolution as introduced by title.”

 

Alternative Motions

 

“I move to approve the resolution as introduced by title, with the following conditions: (list conditions).

 

“I move to continue this item to the Town Council meeting on _____ date to allow additional time to (list information needed).”

 

Attachments

 

Staff Report

Attachment A:                     Resolution

Attachment B:                     Cybersecurity update

Attachment C:                     Staffing Update

Attachment D:                     SCADA Phase 5