Skip to main content
Castle Rock Banner
File #: WC 2026-041    Version: 1 Name:
Type: CR Water Topic Status: New Agenda Topic
File created: 4/1/2026 In control: Castle Rock Water Commission
On agenda: 4/22/2026 Final action:
Title: Fourth Amendment to the Services Agreement with J-U-B Engineers, Inc. for Oversite Services on the 6400 East Tributary at Paintbrush Park Phases 1 and 2 Project [Paintbrush Park] Town Council Agenda Date: May 5, 2026
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo/Audio
No records to display.

To:                     Members of the Castle Rock Water Commission

 

From:                     Mark Marlowe, P.E., Director of Castle Rock Water

                     Mark Henderson, P.E., Assistant Director

                     Roy Gallea, P.E., Engineering Manager

                     Matthew Hayes, P.E., Technical Engineering Manager

                     Josh Hansen, P.E., Project Manager Supervisor

                     Frank Main, Project Manager

                     Aaron Stremel, Water Engineer

                     

Title

Fourth Amendment to the Services Agreement with J-U-B Engineers, Inc. for Oversite Services on the 6400 East Tributary at Paintbrush Park Phases 1 and 2 Project [Paintbrush Park]

Town Council Agenda Date: May 5, 2026

Body

________________________________________________________________________________

 

Executive Summary

 

The purpose of this memo is to request Town Manager approval of Fourth Amendment (Attachment 1) to the Services Agreement with J-U-B Engineers (formerly Anderson Consulting Engineering), Inc. for the 6400 East Tributary at Paintbrush Park Phases 1 and 2 Project. This amendment provides funding to support construction-phase engineering services, project closeout, and preparation and submittal of a FEMA Letter of Map Revision (LOMR). These services are necessary to advance the project from final design into construction and through completion, including regulatory closeout.

Purchase Order No. 3056 was originally authorized on February 15, 2023, in the amount of $107,490. Amendment 1 increased the contract by $98,855 for additional design and permitting efforts, bringing the total to $206,345. Amendment 2 extended the term of the agreement through December 31, 2025, to allow completion of design and permitting work. Amendment 3 further extended the agreement through December 31, 2026, with no additional cost to allow time for bidding support services.

With design now complete and the project moving into construction in 2026, Staff recommends approval of this Fourth Amendment adding $XXX,XXX for engineering support during construction, post-construction documentation, and FEMA coordination for a total authorization of $XXX,XXX. This amendment ensures continuity of engineering services by the Engineer of Record (J-U-B) through project completion and regulatory approval.  The proposed amendment also extends the contract duration through December 31, 2027.

 

Discussion

 

The 6400 East Tributary at Paintbrush Park Phases 1 and 2 Project combines the previously separate Phase 1 and Phase 2 designs into a single construction project. This approach reduces overall construction costs and shortens the construction duration, minimizing impacts to the surrounding residential neighborhood and public park.

The final project design includes improvements that address stream stabilization, dam safety,

water quality, and public recreation goals, including:

                     Redesign of the pond located north of The Grange to support recreational fishing

                     Redesign of the dam embankment to meet State Engineer’s Office criteria for jurisdictional dams

                     Inclusion of water quality capture volume in the new pond

                     Addition of a riprap-reinforced pond overflow spillway

                     Riffle pool drop structures to stabilize the channel grade

                     Riprap and grading to prevent stream bank erosion

                     New soft surface trails, stream crossings, and fishing access improvements

                     Landscaping to enhance aesthetics, reduce erosion, and support wildlife habitat

 

Due to budget limitations, the project did not proceed to construction in 2024 or 2025.

However, based on an updated Engineer’s Opinion of Probable Cost (EOPC), the Town now has a refined understanding of the project budget requirements and has moved forward with bidding the project in 2026.

 

This Fourth Amendment provides funding for construction-phase engineering services, including submittal and RFI review, construction observation, field design support, record drawings, coordination of post-construction survey, and completion of the FEMA Letter of Map Revision (LOMR). These services are necessary to ensure the project is constructed in accordance with the design and successfully closed out. The anticipated construction schedule is Summer 2026 through Summer 2027. This amendment extends J-U-B’s contract through December 31, 2027. 

 

Budget Impact

 

The table below shows the previous amendment history for the Services Agreement between CRW and J-U-B.

 

Amendment

Date

Additional Authorization

Notes

Original Contract

February 15th, 2023

$107,490.00

 

Amendment 1

August 31st, 2023

$98,855.00

 

Amendment 2

January 9th, 2025

$0.00

Extension through December 31st, 2025

Amendment 3

December 29th, 2025

$0.00

Extension through December 31st, 2025

 

This amendment requests an additional $XXX for a total project authorization of $XXX. The project is funded by the 6400 E Trib. Stabilization Fund ().

 

Project Number

Account Name

Account Number

Total Contract Amount

Remaining

Requested Additional Authorization Amount

2026 Budget

250017

6400 E. Trib Stabilization

212-4475-444.75-52

 

$112,000

$421,200

$2,700,000

250017

6400 E. Trib Stabilization

210-4275-442.75-11

 

 

 

$2,700,000

 

Proposed Motion

 

“I move to recommend to Town Council approval of the Resolution as presented

 

Attachments

 

Attachment A:                      Resolution (Not Attached)

        Exhibit 1:                     Exhibit (Not Attached)